Upgrade to ChromeUpgrade to FirefoxUpgrade to Internet ExplorerUpgrade to Safari

Cumming Group – Manchester

  • Manchester
  • April 2026
  • 4 weeks

An exciting project we delivered in spring 2026 for the Cumming Group in central Manchester.

The new workplace brings the Cumming Group Manchester teams together under one roof in the heart of the city centre, creating a dynamic environment designed to support collaboration, connection & continued growth.
We were proud to support the client & wider project team with a comprehensive furniture & fittings package, working from early-stage concepts through to final logistical installation.

Scope of works included:
Full loose furniture specification & in-house supply & installation, including informal areas, workstations, task seating, meeting space & social settings.
A complete furniture portfolio featuring products from a number of CBOF Group suppliers.
Bespoke joinery package including a main reception desk, sliding barn-effect doors dividing the teapoint & breakout space, an industrial hanging frame over the drinks bar & integrated shelving features.

The project was delivered and installed by our dedicated CBOF Group team, who were based in Manchester for a period to ensure a seamless delivery and excellent end product for the client team.